Luton Airport – installation of wine bar at the new airside departure terminal. 

The qualifying criteria for working airside at Luton Airport is extremely stringent, this combined with the unique logistics involved in working airside and the tight contract period made this a particularly challenging project. The project was HSE notifiable and therefore a full construction phase plan was specifically developed for the project. 

The client had commissioned the design of a retro Italian looking bar. We took possession of an empty designated island space within the new airside departure terminal at Luton airport and within the six week contract period we installed this beautiful bespoke bar, complete with specialist tiled floor and state of the art Dali lighting system.

Eccleston SquareMajor specialist external repairs and redecoration of a grade 2 listed building – Victoria, Central London SW1V

Scope of works comprised: structural repairs including replacement of lintels and brick window arches, rebuilding of defective brickwork, stitch bonding and stabilizing of structurally unsound brick work. Re-pointing of face brickwork, repairs to and replacement of defective stucco work. Replacement of lead, asphalt and slate roofs. Replacement of timber sash windows and French doors, repairs and replacement of internal period cornice, full preparation and external redecoration.

 

Andover – Hampshire SP10

The existing cladding had inherent build defects, which was causing all number of issues, including cold bridging, condensation and rainwater to ingress property. The remedial works was covered by an NHBC insurance claim. The project scope of works comprised, the complete replacement of exterior cladding, the replacement of the windows and doors within the new cladding, the enabling works, associated builders works and internal redecoration.

The project duration was 8 months, from commencement to practical completion and carried out under a full construction phase, Health and safety plan. Additional works carried out within this contract period and not included within the original scope of works were the installation of structural steel work, to support the new specified cladding system and the carrying out of compliant fire compartmentalisation works.